Carving Out a Moment
An earlier version of this article originally appeared in the 2025 edition of Building Stone Magazine.
It’s likely not often a team working on installation and saved the basaltina for a stone installation includes a “puzzle master” on its roster. But this sculptural wall and water feature, part of a New York City whole-office renovation, required someone to create an encoded message. The obstacles for completing this project – dubbed “Holey Water” by the client because of its design using over 1,000 3×3-inch blocks of granite each centered with an etched circle and a dot, and all pitched in different directions — went beyond a secret cipher.

Several installations in this New York City office include an embedded puzzle. This one, made from America Mist granite, glitters under flowing water.
CHALLENGE. ACCEPTED.
Boundaries help designers channel their creativity. This client wanted a folly of sorts, a “moment” that secreted a message about the organization itself, says John Wasilewski, associate principal, RA, of DavidScottParkerArchitects,whoworked on the design with Ian Kessinger, senior associate, AIA. They were tasked with creating the sculptural wall and getting it installed within a five-month schedule; they faced cost limitations and the difficulty of finding a large amount of quality stone.
Originally, they chose basaltina, a lava stone quarried in Italy, since it was used in other areas of the office renovation. “What drove our ultimate choice,” Wasilewski says, “is that we couldn’t get enough stone in the right quality and thickness in the timeframe.” In addition, they were concerned with basaltina’s “hardness and didn’t think that when it was cut it could maintain its crispness. We wanted precise definition and little thickness.”

The stone is put in a sandblasting cabinet where Marcella blasts glass beads to smooth out the stone to the specified matte finish.
With architectural drawings in hand, it was time for the next snag: “A few fabricators, suppliers, and other natural stone professionals turned down the project saying it was too complicated,” says fabricator and consultant Buddy Ontra of BoStone (formerly Ontra Stone Concepts) in Bridgeport, Connecticut, who ultimately took on the project. He chose American Mist granite for the wall the curved gable and capped flowerbed, with tumbled black river rocks in the water collection basin.
Ontra admits that the project was “more detailed than the work I had been doing for the past 30 years.” He reached out to larger manufacturers who were scheduling far out into the future. One told him, “It would take a year just for a mockup sample.”
Finally, Ontra approached Joey Marcella, president of Mario & Son in Liberty Lake, Washington, who is known for his intricate design and architectural work, and fabrication. “Joey embraced the challenge,” Ontra says.

The install begins. Panels are attached by thinset to the substrate wall, already covered in a waterproof membrane. The last section of stone was eight-inches thick so Marcella could carve out the back to create the curve.
HARD STONE. HARD WORK.
Polycor in Quebec City, Canada, cut the granite into 4-inch-thick slabs for the flat area and 6-inch slabs for the radiused area. The slabs were then sent to Marcella, who had the CAD drawing of the wall, which was broken down into 20 individually numbered panels. Each piece was to be 3-inches thick so Marcella could create the hills and valleys specified in the design. Ontra says he recognized that “the elevation would need a vertical pitch of 3⁄4-inch out of plumb for water flow aesthetics. The substrate was plumb, so we directed the sculptor to increase the panel thickness from top to bottom.”
Marcella says the American Mist was “one of the more abrasive materials I’ve ever seen. It very rapidly wore away our diamond tools. Had it been marble we could have done several pieces at a time and set it to forget it and run the machine overnight.” But in this case, each quarter- panel took all night — each panel nearly a week’s worth of work. Marcella had to change the candle tools after each quadrant was completed and then hand blend the stone. This was “frustrating,” admits Marcella, and added a lot of unanticipated time. His crew worked on the project for about two months. “Had it been marble, we’d have been done in a week and a half,” he says.
The completed pieces were trucked from Tacoma, Washington to New York City, where Ontra faced the logistics of getting large sections of stone into a midtown office building. His crew worked long hours over a weekend so the installation wouldn’t interfere with regular office activities.

The decorative base and garden of the completed water feature not only add beauty but keep the water from splashing in to the office space.
After the wall was installed, the aqua scaping firm Okeanos Group completed the roughed in plumbing of the water feature by placing a plastic linear spout along the top of the wall so water would flow evenly down the stones. The decorative base and garden not only add beauty but keep the water from splashing into the office space.
All obstacles overcome, the playful “moment,” with its hidden message, was ready for the client and his employees on a Monday morning, just a few weeks behind schedule. “It was challenging,” says Marcella. “But we like the challenging ones.” No word on whether the challenge of the puzzle has been solved by the office denizens.